Paving Begins June 10th
Paving is set to begin tomorrow, June 10th. Sections are marked with a neon spray paint line and arrow, with the arrow pointed in the direction of the resurfacing. Areas that will be paved include: Split Rail Drive (north from the end of the last overlay to just past Silverwood Ln) Silverwood Lane (two sections east of Split Rail) Fireside […]
