Author Archives: Avery Barnett

2018 Mowing Schedule

Below is the 2018 mowing list. Thank you to all who volunteered. If you aren’t on the list and would like to take a spot, please contact me. 2018 Mowing List

read more

2017 Annual Meeting Minutes Posted

Sorry for the delay, I’ve posted the minutes from the 2017 Annual Meeting. 2017 Annual Meeting Minutes

read more

Missouri Gas Energy Survey

Hello everyone, MGE has requested that we pass along the following message and survey link. If you are interested in getting gas service, please complete the survey to indicate your interest to MGE. You are not signing up for anything or creating any obligation by filling out this survey, only giving MGE information they need to use to plan a possible […]

read more

2017 Entrance Mowing Schedule

The schedule for volunteers to mow the front entrance has been released and is available in the downloads section or from the link below: 2017 Entrance Mowing Schedule Volunteers help keep our costs low (which means more money for road upkeep) by performing the following work: Prune shrubbery as needed Pull weeds from landscaped areas Pick up trash Mow entrance […]

read more

All Yard Waste Sites Decomissioned

The westernmost tract of land in the subdivision was recently purchased from the Petersons. The yard waste sites located there are no longer authorized for use as the property is being prepared for development. Please discontinue use of the yard waste sites. The area will be monitored for unauthorized activity. Residents that are connected to the sewer system can utilize […]

read more

Please Don’t Flush the Non-Flushables!

Everyone that has been to one of the annual meetings in the last few years has heard my mini-speech on not flushing anything that is not specifically labeled “flushable” into the sewer system. This picture, posted by Carterville earlier today, demonstrates the problems they (baby wipes in this case) can cause. Fortunately this isn’t on the sewer system we are […]

read more

Paving Begins June 10th

Paving is set to begin tomorrow, June 10th. Sections are marked with a neon spray paint line and arrow, with the arrow pointed in the direction of the resurfacing. Areas that will be paved include: Split Rail Drive (north from the end of the last overlay to just past Silverwood Ln) Silverwood Lane (two sections east of Split Rail) Fireside […]

read more

Street Signs Coming Soon!

You may have noticed some notification signs appear recently along Split Rail Drive. The county will be installing stop signs on the roads that intersect Split Rail in order to increase safety and prevent accidents. The signs are expected to be in place on or about January 21st. This has been a work in progress for several years and we […]

read more